Brigadoon modifications begin!

Hi All,

Welcome to the new team website.  I thought I would put a post showing some of work that is underway.  The only retractable bowsprit has been removed and the bow redone.  The new bowsprit has been built, but not installed yet.  The ding in the port side from the early season collision at the mooring has been repaired.  The keel and rudder have both been sanded down and will be faired to a new template.  All the deck hardware has been removed and the deck is being sanded down in prep for the new padded teak decks.

The boat will soon head into the shed to get painted!

I will keep updating the site with pictures as we get them.  It’s going to be a fun process!

Permanent link to this article: https://brigadoon.crew-mgr.com/brigadoon-modifications-begin/

Leave a Reply